Villaments for Sale Hennur, Bengaluru

Radiance Floresta perfectly combines all the must have elements of uber luxury living. The gated community is cosmopolitan by choice The dwellings are contemporary by design. The collection of homes are truly preferred classics including Villaments. An eye for zero space wastage, a passion for high-end fittings and fixtures, an obsession for ample ventilation with large windows and a commitment to deliver the best goes into the making of Radiance Floresta homes. Floresta is strategically located in North Bangalore (off the Hennur-Bagalur Road). The posh location that fast growing, well designed and a prime investment area.

A minutes away from hospitals, schools, colleges, entertainment areas, restaurants, and upcoming IT/ITES zones.

Know More

TYPE:

3.5BHK

Villaments (G + 1st Floor, 2nd & 3rd Floor, Penthouse)

Development Size:

1.83 acres

No. of Units:

Villaments 65

  • delivering only the best
  • affordable homes
  • top class amenities
  • eco-friendly projects

Gallery

Highlights

  • Gym

  • Swimming Pool

  • Multipurpose Hall

  • Indoor Games Room

  • Yoga Deck

  • Kids Play Area

  • Sand Pit

  • Association Room

  • Table Tennis

  • Pool Table

  • Video Games Room

  • VR Games

  • Tot Lot

  • Senior Citizens Nook

  • Board games

  • Hamock Garden

  • Pathway

  • Open Gym

  • Yoga / Meditation garden

  • Infinity Swimming Pool

  • Kids Pool

  • Tree Plaza

Floor Plans

Location Advantages

  • Embassy Manyata Business Park - 7.8 Kms
  • Karle Town Centre - 11 Kms
  • Kirloskar Business Park - 10 Kms
  • The Big Market - 2.0 Kms
  • Lulu Value Mart - 2.6 Kms
  • Elements Mall - 7 Kms
  • Orion East Mall - 12 Kms
  • International Airport 20 Kms
  • MG Road Metro Station -15 Kms
  • Bangalore East Railway Station - 11 Kms
  • Cantonment Railway Station - 14 Kms
  • Bangalore City Railway Station - 18 Kms
  • Good Shepherd High School - 450 Mts
  • United International school - 1.3 Kms
  • New Horizon International School - 1.9 Kms
  • St. Norbert School - 2.1 Kms
  • Regal Kidney & Multi-Specialty Hospital - 4.9 Kms
  • North Bangalore Hospital - 8.3 Kms
  • Motherhood Hospital - 9.8 Kms
  • Cloudnine Hospital - 10 Kms

pricing & specifications

type Built up area RATE PER SQFT PRICE
3.5 BHK Villaments (Ground & First Floor) 2456-2547 Sq.ft. Rs.9200 Rs. 2.56 Cr* - 2.65 Cr* (All Inclusive)
3.5 BHK Villaments (Second&Third Floor) 2393 - 2557 Sq.ft. Rs.9000 Rs. 2.45 Cr* - 2.61 Cr* (All Inclusive)
3.5 BHK (Penthouse) 2497 - 2511 Sq.ft. Sold Out Rs. 2.60 Cr* - 2.62 Cr* (All Inclusive)

Setting the Engineering Benchmark for On-Time Delivery

We treat delivery schedules as non-negotiable engineering benchmarks mitigating buyer holding costs, optimizing EMI timelines, and reinforcing investor confidence with every handover.

  • 0 Delays

    Zero Excuses, Zero Compromises

  • 100% Commitment Rate

    Every promise kept, Every deadline met

  • Total Units 294
  • CC Obtained On Nov 2025
  • Committed Date Dec 2025
  • Total Units 247
  • CC Obtained On Jul 2018
  • Committed Date Jan 2020
  • Total Units 274
  • CC Obtained On Nov 2018
  • Committed Date Mar 2019
  • Total Units 234
  • CC Obtained On Sep 2025
  • Committed Date Oct 2025
  • Total Units 125
  • CC Obtained On Sep 2025
  • Committed Date Oct 2025
  • Total Units 523
  • CC Obtained On Mar 2023
  • Committed Date Apr 2023
  • Total Units 452
  • CC Obtained On Mar 2022
  • Committed Date Mar 2022
  • Total Units 105
  • CC Obtained On Oct 2021
  • Committed Date Oct 2021
  • Total Units 395
  • CC Obtained On Oct 2024
  • Committed Date Apr 2025
  • Total Units 322
  • CC Obtained On Jun 2020
  • Committed Date Mar 2021

Unrivalled Quality Assurance – 40,000+ Checkpoints

Each Project undergoes a multi-tiered, digitally logged inspection process encompassing 40,000+ quality validation points—from reinforced concrete strength testing to advanced MEP (mechanical, electrical, plumbing) audits.

QA/QC Lab at Each Site
  • 01QA/QC Lab at Each Site
Dynamic Cone  Penetrometer (strength and compaction)
  • 02Dynamic Cone Penetrometer (strength and compaction)
CBR Test (load-bearing capacity of soils)
  • 03CBR Test (load-bearing capacity of soils)
Chloride & Sulphate Test (suitability of water for construction purposes)
  • 04Chloride Test (suitability of water for construction purposes)
TDS & PH TEST (water quality)
  • 05TDS & PH TEST (water quality)
Steel Strength Test
  • 06Steel Strength Test
Marking of structural elements
  • 07marking of structural elements with total station
Rotary Laser (Leveling, grading, and alignment in 360-degree)
  • 08Rotary Laser (Leveling, grading, and alignment in 360-degree)
Vicat Apparatus (consistency and setting time )
  • 09Vicat Apparatus (cement consistency and setting time )
Concrete Strength Test by Rebound hammer
  • 10Concrete Strength Test by Rebound hammer
Concrete Cube Test
  • 11Concrete Cube Test
Concrete integrity Test
  • 12Concrete integrity Test
AAC BLOCK STRENGTH TEST
  • 13AAC BLOCK STRENGTH TEST
Screw Fixing Checks for plating
  • 14Screw Fixing Checks for Plastering
Tile LEVEL CHECKS
  • 15Tile LEVEL CHECKS
Tile HOLLOW SOUND
  • 16Tile HOLLOW SOUND
Tile Marking Equipment
  • 17Tile marking with Laser Equipment
Tile Adhesive Pullout Test
  • 18Tile Adhesive Pullout Test
PLUMBING LINE PRESSURE CHECKS
  • 19PLUMBING LINE PRESSURE CHECKS
FLUSH LINE DYE TEST
  • 20FLUSH LINE DYE TEST
Electrical Circuit Checks
  • 21Electrical Circuit Checks
TERRACE WATER POND CHECKS
  • 22TERRACE WATER POND CHECKS
Window ALIGNMENT CHECK
  • 23Window ALIGNMENT CHECKS
Door ALIGNMENT CHECKS
  • 24Door ALIGNMENT CHECKS
MOISTURE CHECKS FOR PAINTING
  • 25MOISTURE CHECKS FOR PAINTING
PIN HOLE & UNDULATION CHECKS for things
  • 26PIN HOLE & UNDULATION CHECKS for painting
    Masonry
    VILLAMENT
  • RCC framed concrete structure
  • Earthquake resistance structure adhere to seizmic zone II
  • Anti-termite treatment during stage wise construction
  • AAC light weight blocks for internal and external masonry walls
  • Solid concrete blocks for other masonry walls as per requirement
    VILLAMENT
    Living & dining floor
  • vitrified floor tiles of suitable size
  • Master bedroom floor
  • Laminated Wooden flooring with 8mm thickness
  • Other bedrooms, kitchen & family room floor
  • Vitrified floor tiles of suitable size
  • Balcony, utility & toilet floor
  • Anti skid ceramic floor tiles of suitable size
  • Staircase inside the house for Villaments
  • Granite as per architect design
  • Common staircase
  • Granite as per architect design
  • Ground floor lobby
  • Granite as per architect design
  • Typical floor corridor & lift lobby
  • Vitrified tiles as per architect design
  • External driveway
  • Interlocking concrete paver blocks / Granolithic screed concrete floor
  • Basement car park floor
  • Granolithic screed concrete floor
  • Kitchen wall dado
  • Cement plaster finish, for 600 mm height above counter no tiles
  • Toilet wall
  • Glazed ceramic tiles up to door lintel level
  • Utility wall
  • Glazed ceramic tiles from floor up to 4 feet height
  • Lift facia wall
  • Granite as per architect design
    VILLAMENT
    Water point with tap in Kitchen
  • Will provide separate taps for municipal water and domestic water in kitchen sink location
  • Water point with tap in Utility (wherever applicable)
  • Domestic water in utility sink location
  • Washing machine water point
  • Will be provided in utility
  • Granite with sink
  • Will be provided in utility
  • Water purifier point
  • Will be provided in kitchen
    VILLAMENT
    Main Door
  • 7 feet height factory made door, 35mm thick flush shutter with both sides teak veneer finish, hardwares & digital lock system of DORSET / equivalent make.
  • Bedroom Door
  • 7 Feet height factory made door, 32mm thick flush shutter with both sides laminate finish, hardwares of DORSET / equivalent make.
  • Toilet Door
  • 7 feet height factory made door, 32mm thick flush shutter with both sides laminate finish, hardwares of DORSET / equivalent make. .
  • Window & French Door
  • White UPVC / Aluminium sliding windows with granite sill & clear glass
  • White UPVC / Aluminium sliding french door with clear glass
  • Ventilators
  • White UPVC / Aluminium ventilators with swing open shutters, lock & key for shaft access area
  • White UPVC / Aluminium ventilators with swing open shutters for non access areas
  • Toilet false ceiling
  • Grid type false ceiling as per arcitect design
  • Balcony railing
  • Glass railing as per architect design
  • Internal Staircase Railing
  • Glass railing as per architect design
  • Common Staircase Railing
  • Aesthetically designed MS railing
    Internal Walls
  • 2 coats of Asian / Berger / Dulux / equivalent emulsion paint over base primer & putty
  • Exterior Walls
  • 2 coats of Asian / Berger / Dulux / equivalent exterior emulsion paint over texture
  • Ceiling
  • 2 coats of Asian / Berger / Dulux / equivalent emulsion paint over base primer & putty
  • MS Railing
  • 2 coat of Satin enamel paint of Asian / Berger / Dulux / equivalent over primer
    VILLAMENT
    Sanitary ware
  • Premium range Kohler / American Standards / equivalent
  • CP fittings
  • Premium range Kohler / American Standards / equivalent
  • Closet
  • Wall mount type EWC (European water closet) with wall concealed tank, health faucet
  • Overhead Shower
  • Single lever concealed diverter with over head shower and spout in all toilets
  • Rain shower head for master bedroom toilet and normal shower head for other bedroom toilets
  • Washbasin
  • Counter wash basin with polished granite in any one bedroom toilet, wall hung wash basin in dining room & all other toilets
  • Pipe lines
  • uPVC & CPVC water pipe lines, PVC soil, waste & rain water pipe lines shall be of ISI certified brands like Aashirwad / Astral / Supreme or equivalent
  • Switches and Sockets
    Anchor by Panasonic / Equivalent
  • Wiring
    Fire Retardant Low Smoke (FRLS) copper wire of quality ISI brand POLYCAB / KEI / equivalent
  • Hi wall / Split AC Point
    Provision with electrification in Living or Dining room & all bedrooms
  • TV & Data Point
    Provision with electrification in Living or Dining room & all bedrooms
  • 2 Way Control Switch
    For light and fan point at all bedrooms
  • DG Power Backup
    1500 Watts
  • 20Amps Point
    For water heater with electrification in all toilets
  • 15Amps Point
    For refrigerator, microwave oven in kitchen and for washing machine in utility (3 No's)
  • 5Amps Point
    For chimney, water purifier, mixer / grinder in kitchen and for exhaust fan in all toilets (4 No's)
    Power back up
  • DG power back up for 100% common area
  • Common Lift
  • Passenger lifts of adequate capacity
  • External
  • Landscape & hardscape as per architect design
  • Boundary
  • 6 feet height compound wall

A-Block South side elevation

A-Block Cluster 02,03 South side elevation

A-Block Cluster 02,03 South side elevation

A-Block Cluster-03 Water proofing work in progress

A-Block west side Texture painting work in progress

B-Block North side elevation

B-Block west side Texture painting work in prgress

B-Block Cluster-02 2nd floor toilet tile laying work in progress

B-Block Cluster-01 North side texture painitng work in progress

C-Block West side elevation

C-Block North side external plastering work in progress

East side compound wall Raft work in progress

Club house FF block work in progress

A-Block cluster-02,03 South side elevation

A-Block Cluster 02 Terrace water proofing work completed

A-Block Cluster-01 2nd floor tile laying work in progress

A-Block Cluster-01 2nd floor staircase granite work in progress

B-Block South side Elevation

B-Block North side elevation

West side elevation

A-Block cluster-02 terrace water proofing work in progress

B-Block Cluster-01 4th floor tile laying work in progress

C-Block West side elevation

East side compound wall shuttering work in progress

West side compound wall raft work completed

A-Block South Side Elevation

A-Block Cluster-03 South Side External Plastering Work In Progress

A-Block West Side Elevation

A-Block Cluster-01,02 North Side External Plastering

A-Block Cluster-01,02 Ots External Plastering Completed

A-Block Cluster-02 Internal Wall First Coat Putty Work In Progress

A-Block Cluster-01 Common Staircase Granite Work In Progress

B-Block South Side Elevation

B-Block Cluster-01,02 External Plastering Completed

B-Block Cluster-01,02 Ots External Plastering Completed

B-Block West Side Elevation

B-Block Cluster-01 Terrace Water Proofing Work In Progress

B-Block Cluster-02 Internal 1st Coat Putty Work In Progress

B-Block Cluster-01 Tiles Laying Work In Progress

B-Block Cluster-01 Common Staircase Granite Work In Progress

B-Block Cluster-01 Common Staircase Granite Work In Progress

B-Block Cluster-01 Common Staircase Granite Work In Progress

C-Block West Side Elevation

C-Block South Side External Plastering

North Side Compound Wall Shuttering Work In Progress

A-BLOCK SOUTH SIDE ELEVATION

A-BLOCK CLUSTER-01 PARAPET WALL PLASTERING WORK IN PROGRESS

A-BLOCK WEST SIDE EXTERNAL PLASTERING

A-BLOCK CLUSTER-02 3rd FLOOR INNER PLASTERING

A-BLOCK NORTH SIDE EXTERNAL PLASTERING

A-BLOCK CLUSTER-02 OTS EXTERNAL PLASTERING

A-BLOCK CLUSTER-01, 02 SOUTH SIDE EXTERNAL PLASTERING

A-BLOCK CLUSTER-01 ELEVATION SLAB WATER PROOFING WORK IN PROGRESS

A-BLOCK CLUSTER-01 GF CEILING AND WALL PUTTY WORK IN PROGRESS

B-BLOCK SOUTH SIDE ELEVATION

B-BLOCK SOUTH SIDE EXTERNAL PLASTERING

B-BLOCK CLUSTER-01 NORTH SIDE EXTERNAL PLASTERING

B-BLOCK CLUSTER-01 PARAPET WALL PLASTERING WORK

B-BLOCK WEST SIDE EXTERNAL PLASTERING

C-BLOCK

C-BLOCK 4TH FLOOR BLOCK WORK IN PROGRESS

CLUB HOUSE 1ST FLOOR ROOF SLAB SHUTTERING WORK IN PROGRESS

A-BLOCK SOUTH SIDE ELEVATION

A-BLOCK CLUSTER-01 SOUTH SIDE ELEVATION SLAB COMPLETED

A-BLOCK CLUSTER-02,03 ELEVATION SLAB SHUTTERING WORK IN PROGRESS

A-BLOCK UP TO 3RD FLOOR BLOCK WORK COMPLETED

A-BLOCK CLUSTER-03 4TH FLOOR BLOCK WORK IN PROGRESS

A-BLOCK CLUSTER-01 3RD FLOOR INNER PLASTERING WORK IN PROGRESS

A-BLOCK WEST SIDE EXTERNAL PLASTERING WORK IN PROGRESS

A-BLOCK CLUSTER-01 SOUTH SIDE EXTERNAL PLASTERING WORK IN PROGRESS

B-BLOCK NORTH SIDE ELEVATION

B-BLOCK CLUSTER-01 HR AND ELEVATION SLAB COMPLETED

B-BLOCK CLUSTER-02 HR AND ELEVATION SLAB COMPLETED

B-BLOCK CLUSTER-03 ELEVATION SLAB COMPLETED

B-BLOCK TERRACE WEST SIDE ELEVATION COLUMN AND BEAM COMPLETED

B-BLOCK UP TO 3RD FLOOR BLOCK WORK COMPLETED

B-BLOCK WEST SIDE EXTERNAL PLASTERING IN PROGRESS

B-BLOCK SOUTH SIDE EXTERNAL PLASTERING WORK IN PROGRESS

C-BLOCK

A-BLOCK SOUTH SIDE ELEVATION

A-BLOCK WEST SIDE ELEVATION

A-BLOCK 4TH FLOOR BLOCK WORK IN PROGRESS

A-BLOCK CLUSTER-03 FF INTERNAL PLASTERING WORK IN PROGRESS

B-BLOCK NORTH SIDE ELEVATION

B-BLOCK WEST SIDE ELEVATION

B-BLOCK WEST SIDE ELEVATION

B-BLOCK CLUSTER-02 ELEVATION SLAB AND OHT SLAB SHUTTERING WORK IN PROGRESS

B-BLOCK CLUSTER-02 4TH FLOOR BLOCK WORK IN PROGRESS

B-BLOCK CLUSTER-02 1ST FLOOR INTERNAL PLASTERING WORK IN PROGRESS

B-BLOCK CLUSTER-02 2ND FLOOR INTERNAL PLASTERING WORK IN PROGRESS

C-BLOCK WEST FACE

C-BLOCK UPTO 1ST FLOOR BLOCK WORK COMPLETED

CLUB HOUSE GF ROOF SLAB REINFORCEMENT WORK COMPLETED

CLUB HOUSE GF ROOF SLAB ELECTRICAL CONDUIT LINE LAYING WORK IN PROGRESS

A-BLOCK SOUTH SIDE VIEW

A-Block cluster-01,02 Upstanding Beam concrete work in progress

A-Block cluster-03 4th floor roof slab RCC Completed

A-Block GF,FF and SF Block work completed

A-Block 3rd floor Block work In Progress

B-Block North side View

B-Block cluster-01,02 Terrace Lift wall reinforcement work in progress

B-Block cluster-03 4th floor roof slab and beam reinforcement work in progress

B-Block GF,FF and SF Block work completed upto lintel level

B-Block 3rd floor Block work In porgress

B-Block GF Lintel concrete work in progress

B-Block cluster-01 GF Inner electrical conduit line packing work

Model Flat Toilet wall tiles laying work in progress

C-Block West side View

C-Block 4th floor roof slab and beam shuttering work in progress

Club House GF Lift wall shuttering work in progress

Floresta Site Progress Photos - Jun 2025

Block - A North Side View

Block - A Cluster - 01 4th Floor Roof Slab Concrete Completed

Block - A Cluster - 03 4th Floor Roof Slab Shuttering & Reinforcement Work In Progress

Block - B South Side View

Block - B Cluster - 02 & 03 (2 Unit) 4th Floor Roof Slab Shuttering Work In Progress

Block - B Cluster - 03(2 unit) 3rd Floor Column Rcc Work Completed

Block - B Cluster-01, 02 & 03 (2 unit) Gf And Ff Block Work Completed Upto Lintel Level

Block - C West Side View

Club House - Gf Roof Slab Shuttering Work In Progress

Copyrights Radiance Realty. All Rights Reserved. Website Designed & Developed by GlintCreatives.com